Notice: fwrite(): Write of 588 bytes failed with errno=28 No space left on device in /home/sgwd/public_html/sema/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 42
SEMA - Architects -
Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/sgwd/public_html/sema/wp-includes/functions.php on line 6131

Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /home/sgwd/public_html/sema/wp-includes/functions.php on line 6131
ABOUT US

Steven E. Myott Architecture's mission is to provide superior architectural services to owners and tenants of commercial real estate throughout South Florida.

Our core business is focused on office, medical, industrial and retail interiors, new construction, renovation and design services associated with commercial real estate, specifically in South Florida. Our firm has extensive experience in complex interiors. We have designed many successful projects for well-known companies throughout the region.
Learn More
PROJECTS
Kellstrom Defense

Kellstrom Defense

Interior improvements to accommodate a new aerospace repair and manufacturing facility including offices, a factory area with engineering, testing and machine shop facilities, avionics lab and warehouse storage and distribution....

Learn More
Diagnostic Centers of America (Multi-Location)

Diagnostic Centers of America (Multi-Location)

Multiple projects in multiple locations with interior & exterior improvements including a building addition. These facilities accommodate new multimodal imaging centers as well as the relocation of corporate headquarters. Complete...

Learn More
Aviall (A Boeing Company)

Aviall (A Boeing Company)

Aerospace repair and distribution facility with wheel and brake, battery rebuilding and hose fabrication. The facility also included a 2,000 S.F. hazardous material storage space of explosion proof construction. The...

Learn More
Aero Accessories

Aero Accessories

Multiple projects composed of interior improvements for corporate headquarters consisting of a 13,275 S.F. office component as well as avionic fuel, hydraulic, pneumatic electro-mechanical & avionic components repair areas as...

Learn More
Kellstrom Aerospace Group | Vortex Engines

Kellstrom Aerospace Group | Vortex Engines

Interior improvements to accommodate a new facility including an office component and repair shop area with new overhead cranes for engine repair. The complete facility is air conditioned and includes...

Learn More
Postal Centers International Original Impressions (PCIOI)

Postal Centers International Original Impressions (PCIOI)

Relocation and consolidation of company headquarters to new warehouse/office facility with facility renovations to accommodate large scale printing and high-speed mail sorting equipment. Equipment throughout required multiple connections including power,...

Learn More
Aetna

Aetna

Conversion of shell warehouse into automated pharmaceutical distribution center and customer service call center. Project included conversion to chilled water cooling, full emergency generator backup and computer control system suite....

Learn More
Triad Isotopes

Triad Isotopes

Interior improvements to accommodate new pharmacy facilities including lab facilities with 3,000 S.F. clean room for producing radioactive prescriptions. Secure handling areas and general office were also included.

Learn More
TrustBridge

TrustBridge

Renovation of a 25,000 S.F. shell warehouse to medical equipment and pharmacy distribution. Improvements over time include a 3,000 S.F. pharmacy with secure and refrigerated areas and an intravenous prescription...

Learn More
HD Smith

HD Smith

Multiple improvements to shell warehouse adding 87,000 S.F. of distribution space including refrigerated and secure areas. Multiple I.T. improvements and installation of automated conveyor systems was included.

Learn More
Palm Beach Pediatrics

Palm Beach Pediatrics

Dr. Fox and the Palm Beach Pediatrics staff envisioned a caring, comforting atmosphere where patients and families could connect with caregivers. Patient areas are arranged for minimum travel distance. Triage,...

Learn More
Berkshire Hall, San Jose

Berkshire Hall, San Jose

Learn More
Walters Hall, San Francisco

Walters Hall, San Francisco

Learn More
Cleave House, Sacramento

Cleave House, Sacramento

Learn More
Ainsworth

Ainsworth

Learn More
CB Oncology Partners

CB Oncology Partners

Converting a retail space, formerly a bank at the end bay of a shopping center, into a Radiation Oncology Center. The center features a Varian Tru Beam linear accelerator housed...

Learn More
KELLSTROM AEROSPACE GROUP

KELLSTROM AEROSPACE GROUP

Interior improvements to accommodate a new facility including an office component and repair shop area with new overhead cranes for engine repair. The complete facility is air conditioned and includes...

Learn More
Diagnostic Centers of America, West Palm Beach

Diagnostic Centers of America, West Palm Beach

Expansion of Diagnostic Centers of America into West Palm Beach. Converted a largely vacant retail center into a Multi Modal Imaging Center equipped with two MRI machines, PET CT, CT,...

Learn More
TESTIMONIALS

“ Steven E. Myott Architecture delivers outstanding designs with precision and creativity. Working with them was seamless, and the result exceeded our expectations. Highly recommend! ”

-     Customer Name Here


Notice: fwrite(): Write of 369 bytes failed with errno=28 No space left on device in /home/sgwd/public_html/sema/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 42

Fatal error: Uncaught wfWAFStorageFileException: Unable to verify temporary file contents for atomic writing. in /home/sgwd/public_html/sema/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:51 Stack trace: #0 /home/sgwd/public_html/sema/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(658): wfWAFStorageFile::atomicFilePutContents('/home/sgwd/publ...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('transient') #2 {main} thrown in /home/sgwd/public_html/sema/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 51